2021 TSPLOST Resurfacing

The 2021 TSPLOST Resurfacing will resume on Wednesday, May 4, 2022. Resurfacing will take place on Harris St. (from Irene Kidd Pwy. to East Washington Ave), We will continue to update residents on a weekly basis on the next street that will be resurfaced. Throughout construction, traffic control will be provided to ensure safety for motorists and pedestrians.

STEAM Summer Camp

City Hall 2757 East Point Street, East Point, GA
Recurring

Hydrant Flushing

The Water & Sewer Department will conduct hydrant flushing for distribution maintenance during the month of May on the following dates:

May 2 through May 6
Pegg Rd., Hardwood Dr., Glenway Dr., Sylvan Rd., Randell St., Wadley Ave., Lyle Ave. and Veterans St., Bachelor St. and Walker Ave., Main St. and Vesta Ave., East Point St., Dresden Trail. ,Stoneview Ter., Castlewood St., Ivydale St., Calvin Ave. and Ivydale St., Norman Berry Dr. and Bobby Brown Pkwy.

May 9 through May 13
South Meadows, North Commerce, Phillips Ave. and Pearl, Central Ave., Red Wine and N. Desert, Legacy and Parkway Circle, Center Ave., Semmes St., Prince George Ave., East Farris Ave., Idlewood Rd. Lake Terrace

May 16 through May 20
Savannah Walk Subdivision
Savannah Dr., Savannah Trail, Savannah Court, South Meadow Business Complex

Heritage Park Subdivision
Heritage Parkway, Parkway Circle, West Park Circle at West Gate Blvd.

Lakeside Subdivision
Lake Manor Way, Preservation Circle, Otter Dam Court, King Fisher Dr. and Jailette Rd., Lake Enclave Way, Lake Estates Way, Lakeside Blvd.

+ +