2021 TSPLOST Resurfacing

The 2021 TSPLOST Resurfacing will resume on Wednesday, May 4, 2022. Resurfacing will take place on Harris St. (from Irene Kidd Pwy. to East Washington Ave), We will continue to update residents on a weekly basis on the next street that will be resurfaced. Throughout construction, traffic control will be provided to ensure safety for motorists and pedestrians.

STEAM Summer Camp

City Hall 2757 East Point Street, East Point, GA

Resurfacing Resumes on Montrose Drive & Neely Avenue

Please be advised that the following roads are tentatively scheduled for repair and resurfacing beginning Tuesday, June 21, 2022. Resurfacing along Montrose Dr. from Delowe Dr. to Semmes St. Neely

Downtown Film Closure

The following City public parking lots will be closed as follows (see map in link below for reference):

City Lots A, B, C, E, F, G, H & J: Thursday, June 23rd through Thursday, July 7th

City Lots D: Thursday, June 30th through Friday, July 1st

**Use of these lots includes, but is not limited to, staging of events, parking, equipment storage/set-up, trucks loading/unloading, tents set-up, etc.**

Link with additional information and reference maps:
http://www.icontact-archive.com/archive?c=1473700&f=10027&s=10483&m=276883&t=ce795367e16a3c4e173a85f9e7d52a46ffe822f2fb35c5377dd8544c770db36d

Road Closure: Cedar Avenue Water Main Project

There will be a road closure on Cedar Ave from Blount Street to Harlan Drive starting on next Monday, June 27, 2022 to Thursday, June 30, 2022 to conduct water main repairs. Traffic will be detoured around this section of roadway.

+ +